The Daily Telegram
1226 Ogden Avenue
Superior, Wisconsin 54880
715-394-4411
Project Description
In the fall of 2001, Nasi Roofing was contracted to install a 16,500 square foot Duro-Last roofing system. There were two different roofing systems on the building: a traditional standing seam section and a section where the standing seam was sprayed with a foam coating. Specially cut three inch EPS polystyrene insulation fillers were laid in between the standing seam ribs, and a layer of fan fold insulation was installed over both sections to create a flat surface for the new Duro-Last roofing system. The increased r-value reduced the heat loss and ice build-up on the roof.
Reference
"The work performed by Nasi Roofing was well organized and very professional. The workers were very cooperative and did not interrupt our workflow during installation of the Duro-Last roofing system. Nasi Roofing explained the process well at the beginning of the project. Prior to installation of the Duro-Last roof, we had a history of leakage though out the plant and after installation we have been leak-free. We are very satisfied with our new roof."
Howard Mackey
Production Director
|